Saturday, July 21, 2012

Bathroom Renovation

We decided this spring that we needed to do something about the bathrooms.  When we moved in the master shower was pretty gross, both bathrooms desperately needed to be painted, and we wanted to update the bathroom overall.  What started out at new vanities, granite, and flooring, ended up a complete two-bathroom overhaul!  The contractor, who had done a lot of work on my parents house in the past, started July 12th, and we should be finished in a week and a half or so.  Everything depends on how long it takes them to fabricate the granite, but we are almost certain everything will be completely done before I start back to work on August 8th.  That is the most important thing-to not have to deal without bathrooms once i start back to work.  Right now we are down to a toilet in the master bath and a shower in the hall bath.  We have been going swimming in the evening at the neighborhood pool and bathing the boys there! :)



Day 1:  Master Bath
Master Shower

Master Vanity + awesome vinyl floor

Master Tub





Master Vanity + Dave, the contractor

Day 3
Master Shower/Tub (The only thing we kept was the master tub)
Master "vanity" removed, toilet removed
Day 6:  Hall Bath
Tub/toilet
"vanity" (I didn't make it home in time from my errands to get a picture before he tore everything out!)
Day 9 (Today)
Hall Bath:  new bath/shower and ceiling vent
Hall Bath:  New bath/shower
Master Bath:  New tile, vanity, toilet, vent, and PAINT!!!  ( couldn't WAIT to paint this bathroom!)
Master bath:  New tile in shower and tub.  Grout comes on Tuesday once they finish tiling the other bathroom.
Master tub
 

0 comments: